Compute min / max / gain / loss / length over sampled stations. Gain and loss gate each step at 0.5 m so 30 m-class DEM jitter doesn't accumulate into phantom climbing.
The sampled stations in line order.
Compute min / max / gain / loss / length over sampled stations. Gain and loss gate each step at 0.5 m so 30 m-class DEM jitter doesn't accumulate into phantom climbing.